固體絕緣柜用絕緣堵頭的研究
張洪鐵,費(fèi)翔,姜冠玉
(平高集團(tuán)有限公司,河南 平頂山 467001)
摘 要:固體環(huán)網(wǎng)柜應(yīng)具備全絕緣性,所有裸露的電導(dǎo)體必須用絕緣堵頭封堵保護(hù)。對(duì)12 kV固體絕緣環(huán)網(wǎng)柜堵頭的安裝困難且界面可能滯留氣泡的問題進(jìn)行研究,分析了絕緣堵頭的安裝位置和絕緣結(jié)構(gòu)以及問題產(chǎn)生的原因,并設(shè)計(jì)出新型的堵頭,電場仿真計(jì)算驗(yàn)證了所提解決方案的可行性。
關(guān)鍵詞:固體環(huán)網(wǎng)柜;絕緣堵頭;電場分析;結(jié)構(gòu)設(shè)計(jì)
中圖分類號(hào):TM591 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2018)07-0055-03
Study on Insulation Plug in Solid Insulated Switchgear
ZHANG Hong-tie, FEI Xiang, JIANG Guan-yu
(Pinggao Group Co., Ltd, Pingdingshan 467001, China)
Abstract: The solid ring main unit should be provided with all insulation and all the exposed electric conductors have to be protected by insulation plugs. This paper researched on the problems of possibly retention bubbles on interface and the installation difficulty of 12 kV solid-insulated ring main units plugs, analyzed the installation location of insulation plugs, insulation structure and causes of problems, and designed the new-type plugs. The electric field simulating calculation verifies the feasibility of the mentioned solution.
Key words: solid ring main unit; insulation plug; electric field analysis; structural design
參考文獻(xiàn)
[1] 朱書明.12 kV固體絕緣環(huán)網(wǎng)柜生產(chǎn)應(yīng)用與市場研究報(bào)告[R/OL]. [2014-06-27]. http://www.chinacbe.com/Jishu/1/806.html.
[2] 鐘恒強(qiáng). 固體絕緣環(huán)網(wǎng)柜在配網(wǎng)中壓領(lǐng)域的技術(shù)現(xiàn)狀及市場前景分析[J]. 電氣應(yīng)用,2011,30(17):60-62.
[3] 國家電網(wǎng)公司.12 kV固體絕緣環(huán)網(wǎng)柜技術(shù)條件:Q/GDW 730—2012[S]. 北京:中國電力出版社,2012 :8-10.
[4] 錢家驪,袁大陸. 高壓開關(guān)柜——結(jié)構(gòu)、計(jì)算、運(yùn)行、發(fā)展[M]. 北京:中國電力出版社,2006.