大型受端城市電網(wǎng)黑啟動(dòng)電源規(guī)劃研究
郭挺,高艷娜,朱志芳,董紅
(廣東電網(wǎng)有限責(zé)任公司廣州供電局,廣東 廣州 510620)
摘 要:廣州電網(wǎng)負(fù)荷密集,交直流混聯(lián)運(yùn)行特性復(fù)雜,局部故障引發(fā)大面積停電風(fēng)險(xiǎn)日益凸顯。以恢復(fù)重要用戶供電和盡快啟動(dòng)近區(qū)主力電廠為目標(biāo),提出了黑啟動(dòng)電源布局規(guī)劃的基本原則。給出了表征恢復(fù)速度的黑啟動(dòng)恢復(fù)級(jí)數(shù)實(shí)用化指標(biāo),探索了常規(guī)氣電機(jī)組、現(xiàn)有機(jī)組加裝儲(chǔ)能、煤電機(jī)組FCB改造及柔直背靠背互聯(lián)等4 種方式的黑啟動(dòng)電源規(guī)劃方案,并評(píng)估了“十四五”期間廣州電網(wǎng)的黑啟動(dòng)能力,對(duì)指導(dǎo)大型受端城市電網(wǎng)黑啟動(dòng)電源規(guī)劃具有一定的借鑒意義。
關(guān)鍵詞:黑啟動(dòng);電源規(guī)劃;故障恢復(fù)級(jí)數(shù)
中圖分類號(hào):TM715 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1007-3175(2020)10-0058-04
Research on Black Start Power Source Planning in Large City Received-End Power Grid
GUO Ting, GAO Yan-na, ZHU Zhi-fang, DONG Hong
(Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd, Guangzhou 510620, China)
Abstract: Guangzhou is the larger load center in the power grid, the AC/DC hybrid operation characteristics are complex, and the risk of large-area power outage caused by local fault is increasingly prominent. To restore the power supply of important users and start the main power plants in the near area as soon as possible, the basic principles of black start power planning are proposed. The fault recovery steps index of black is given, representing the recovery speed. Four types of black start power planning schemes are explored, including conventional gas turbine units, existing units with energy storage, FCB transformation of coal-fired power unit and back-to-back VSC HVDC interconnection. The black start capability of Guangzhou Power Grid during the "14th five year plan" period is evaluated, which has certain reference significance for guiding the black start power planning of large receiving end city power grid.
Key words: black start; power planning; fault recovery steps index
參考文獻(xiàn)
[1] 印永華,郭劍波,趙建軍,等. 美加“8·14”大停電事故初步分析以及應(yīng)吸取的教訓(xùn)[J]. 電網(wǎng)技術(shù),2003,27(10):8-11.
[2] 唐斯慶,張彌,李建設(shè),等. 海南電網(wǎng)“9·26”大面積停電事故的分析與總結(jié)[J]. 電力系統(tǒng)自動(dòng)化,2006,30(1):1-7.
[3] 童曉陽(yáng),王曉茹. 烏克蘭停電事件引起的網(wǎng)絡(luò)攻擊與電網(wǎng)信息安全防范思考[J]. 電力系統(tǒng)自動(dòng)化,2016,40(7):144-148.
[4] 劉棟,孫英云. 基于社會(huì)效益最大化的黑啟動(dòng)電源規(guī)劃[J]. 電力系統(tǒng)自動(dòng)化,2009,33(12):17-21.
[5] 趙昱宣,孫磊,林振智,等. 微網(wǎng)作為黑啟動(dòng)電源的電力系統(tǒng)網(wǎng)架重構(gòu)優(yōu)化策略[J]. 電力系統(tǒng)自動(dòng)化,2018,42(17):9-17.
[6] 孫磊,張璨,林振智,等. 計(jì)及電動(dòng)汽車充電站作為黑啟動(dòng)電源的網(wǎng)架重構(gòu)優(yōu)化策略[J]. 電力系統(tǒng)自動(dòng)化,2015,39(14):75-81.
[7] 周云,嚴(yán)正,李乃湖,等. 考慮恢復(fù)時(shí)間模型的電力系統(tǒng)黑啟動(dòng)策略[J]. 電工電能新技術(shù),2015,34(2):13-19.
[8] 周劍,黃磊,劉春曉,等. 基于魯西背靠背柔性直流系統(tǒng)的南方電網(wǎng)黑啟動(dòng)方案[J]. 南方電網(wǎng)技術(shù),2017,11(6):8-14.
[9] 趙達(dá)維,劉天琪,李興源,等. 電網(wǎng)黑啟動(dòng)方案評(píng)價(jià)指標(biāo)體系及應(yīng)用[J]. 電力系統(tǒng)自動(dòng)化,2012,36(21):7-12.