基于IEC 61850的智能變電站遠動信息接入方法及其改進

來源:電工電氣發(fā)布時間:2016-03-15 10:15 瀏覽次數(shù):868

基于IEC 61850的智能變電站遠動信息接入方法及其改進 

邱建斌1,陳建洪1,朱建全2 
1 福建省電力有限公司檢修分公司,福建 福州 350013;
2 華南理工大學(xué) 電力學(xué)院,廣東 廣州 510640
 
 

摘 要:介紹了一種基于IEC61850協(xié)議的500kV智能變電站遠動信息接入方法,分析了其與傳統(tǒng)500kV變電站接入方法的區(qū)別及優(yōu)勢。通過對500kV智能變電站實際應(yīng)用表明,該方法適應(yīng)了智能變電站二次信號過程層網(wǎng)絡(luò)化的需求。在此基礎(chǔ)上提出基于GOOSE組網(wǎng)與MSV組網(wǎng)直接采樣的遠動信息接入方式的改進方案,增強了信息共享,對優(yōu)化智能變電站的自動化網(wǎng)絡(luò)結(jié)構(gòu)具有重要意義。
關(guān)鍵詞:智能變電站;遠動接入;IEC61850協(xié)議;MMS網(wǎng)絡(luò);GOOSE網(wǎng)絡(luò);MSV網(wǎng)絡(luò)
中圖分類號:TM63 文獻標識碼:A 文章編號:1007-3175(2013)02-0016-03


Smart Substation Remote Information Access Method and Its Improvement Based on IEC 61850 Protocol 

QIU Jian-bin1, CHEN Jian-hong1, ZHU Jian-quan2 
1 Maintenance Branch Company of Fujian Electric Power Company Limited, Fuzhou 350013, China; 
2 School of Electric Power, South China University of Technology, Guangzhou 510640, China
 
 

Abstract: Introduction was made to a kind of 500kV smart substation remote information access method based on IEC61850 protocol. This paper analyzed its predominance and made differences between it and traditional 500kV substation connection-in method. Practical application in 500kV smart substation shows that the method is adaptable to the needs of smart substation secondary signal process layer networklization. And on this foundation, this paper raised an improved method of remote information access of direct collecting based on GOOSE, MSV group networks, which increased information share, with significance for optimizing automatic network structure of smart substation.
Key words: smart substation; remote access; IEC61850 protocol; MMS network; GOOSE network; MSV network


參考文獻
[1] 陳安偉,樂全明,張宗益,等.500kV變電站智能化改造的關(guān)鍵技術(shù)[J].電力系統(tǒng)自動化,2011,35(18):47-50.
[2] Q/GDW383—2009 智能變電站技術(shù)導(dǎo)則[S].
[3] Q/GDW441—2010 智能變電站繼電保護技術(shù)規(guī)范[S].
[4] Q/GDW394—2009 330~750kV智能變電站設(shè)計規(guī)范[S]. 
[5] 陳文升,錢唯克,樓曉東.智能變電站實現(xiàn)方式研究及展望[J].華東電力,2010,38(10):1570-1573.
[6] 樊陳,倪益民,竇仁輝,等.智能變電站過程層組網(wǎng)方案分析[J].電力系統(tǒng)自動化,2011,35(18):67-71.